Through publication in the Federal Register on June 28, 2024, the Rocky Mountain (RM) region, under Rate Order No. WAPA-212, entered into a rate ad…
Cut out 2 blisters and install a 20 feet x 3 feet patch using cement and membrane. Install a 3 inches drain insert using water block and an 8 feet …
INL must sustain assets by completing installation or improvements to building and equipment instrumentation activities to assure mission readiness…
The scope of work associated with this project is the post-irradiation examination (PIE) at INL's MFC on the irradiated commercial fuel rods delive…
Repair door and pressure wash 707-67B and 707-66B.…
This instrument will be used to characterize solid/powder materials both morphologically and chemically through image and EDS (Energy Dispersive X-…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Clemson University (Clemson) to research and de…
Bonneville Power Administration (BPA) proposes to allow Verizon to upgrade their antennas and equipment at an existing site called Rocky Flats. The…
The existing failed BESS inverter will be removed and replaced with a new inverter supplied by a different vendor. This will also require the repl…
An advisory team will be built to engage stakeholders, Preferred Subcontractor/Sub-recipient L and T DES will baseline the current energy scenario …