Select, synthesize, and characterize tailored solid adsorbents for computational modeling, bi-layer and segmented laminated structures development,…
NETL will develop a high temperature and high pressure (HTHP) reactor to simulate subsurface conditions which will allow the study and development …
This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
This scope of work covers general R and D activities performed in 773-A Lab C-064, activities performed may include any of the following.…
Install additional recepticals and replace flooring in 730-A Rm167.…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory (Building 999-1W…
BPA proposes to jointly fund Oregon Department of Fish and Wildlife (ODFW) along with US Forest Service (USFS) in the removal of roadbeds, removal …
BPA proposes to fund Idaho Fish and Game to construct four fish screens on private lands in the Upper Salmon River Basin in Lemhi County.…
HEPA filters will be removed and the roughing filters will remain.…
HVAC Chiller No. 1 and No. 3 cooling water vent valves are to be replaced with lighter ones and pipe hangers are to be reinforced.…