PWC will implement advanced technologies and equipment that will support increased system visibility, the use of autonomous controls, integration o…
Replacing three manual switches and three oil circuit reclosers with SCADA remote controlled electronic reclosers…
1. Deploy substation transformers, 2. Replace circuit breaker, 3. Install network reclosers along with their accompanying controllers and Remote Te…
Distribution substation upgrade, five sections of overhead distribution lines conversion to underground, 3-phase overhead line rebuild, and SCADA s…
Replacing old existing wooden poles with new wood poles along with new hardened conductors, insulators, and down guys. …
(1) hardening or undergrounding of over 950 distribution poles, (2) hardening 57 transmission spans, (3) installing Fault location, isolation and r…
Building construction (concrete, footings, raceways/troughs), electrical equipment installation.…
Remove the wooden transformer platform at 501-A per E-FCR-A-00216 which will consist of performing electrical modifications such as removing existi…
Project RELIEF will deploy advanced high-temperature, low-sag (HTLS) conductors on 250 miles of transmission lines, leading to 2x capacity increase…
Upgrading voltage from 2.4kV Delta to 12.5kV Wye, Replacing obsolete hardware with updated components, Completing the loop feed will ensure that po…