Construction of a 34.5 - 14.4/24.94Y, 12/16/20 MVA substation including, but not limited to, disturbing an area of not more than two (2) acres by c…
Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) power circuit breaker (PCB) and to complete additional equipment …
Bonneville Power Administration (BPA) proposes to reconductor the first two spans (approximately 250 linear feet) of the 138-kilovolt (kV) Heyburn-…
BPA proposes to reconfigure bays and install new equipment inside the existing BPA Pearl Substation in Sherwood, Oregon. The proposed work would ac…
Installing new feeder lines from the switchgear to the substation transformer. …
The work involves the installation of approximately 5,400 LF of conduits encased in concrete, 9 manholes, 9 padmount transformers and 2 pad mounted…
Installation of about 300 miles of Fiber (which will mainly be for substation security systems) and Substation Security Systems – Cameras and addit…
The proposed Project aims to enhance the resilience and efficiency of Anaheim's electrical grid through strategic modernization efforts, including …
CX-032975: PGE Reconductor Project Crossing BPA's Keeler-Oregon City-2 on BPA Fee-Owned Right-of-Way
Bonneville Power Administration (BPA) proposes to authorize Portland General Electric (PGE) access to BPA fee-owned right-of-way (BPA ROW) to recon…
This environmental questionnaire includes the replacement of analog utility service meters with advanced meter infrastructure.…