Bonneville Power Administration (BPA) proposes to replace insulators, remedy impairments and improve access roads in multiple locations along the C…
The proposed project is broken into two parts, with the first part covering reconductoring and reconstruction of a single-phase line serving the po…
The insulation and jacket for some of the piping outside of A-Line needs to be repaired/replaced.…
Bonneville Power Administration (BPA) is proposing to replace a deteriorating wood pole structure and any associated hardware and guys at one locat…
Bonneville Power Administration proposes to decommission the septic system and connect to the public sewer system at the Albany Substation, located…
Road G Milling, Paving, and Striping.…
These work instructions are to safely changeout the leaky eyewash bowl and components for the permanent Eyewash/Safety Shower located at 717-5N.…
Remove and dispose of the existing asphalt in the IRC 602 West Parking Lot and IRC 605 Laydown Yard, install 9 light poles in IRC 602 West Parking …
A caustic leak has been identified near column 57. Removal and installation of asbestos insulation is required for this repair.…
This EEC covers all flushing, inspections, and maintenance of the fire water systems across the SRS. These activities are conducted by the SRS Fire…