Crane is being excessed via established SRS protocol.…
SREL intends to excess 29 handy houses of varying sizes to the SRSCRO.…
Move the 681-3G transformers without oil to 681-1G (retired) pumphouse for ultimate disposition by the CRO. The 681-1G transformers are currently s…
Power and communication lines will be fed to the building aboveground through conduit on jersey blocks, underground from an existing pole, or overh…
Bonneville Power Administration (BPA) proposes to rebuild the first 4 miles of its Red Mountain-White Bluffs 115-kV transmission line from Red Moun…
The purpose of the proposed action is to provide a new leased Machining and Fabrication Engineering Laboratory (MFEL) that will include office spac…
Offsite Lease of Office Space for SRNS staff to support ongoing projects.…
The Department of Energy (DOE) proposes to exercise an existing five-year lease extension option for approximately 65,000 gross square feet of rese…
LM is proposing to perfom light detection and ranging (lidar) survey of the disposal cell at the Weldon Spring Site.…
All activities will occur within areas previously disturbed by construction and operation of WAPA and Basin Electric Coop facilities.…