The Naval Reactors Facility Transporter Transfer Path General Plant Project will replace the existing hydraulic lifting machine transfer pathway with a new transporter transfer path.
CF-638 and PBF-632 are two buildings that have fallen into disrepair. As a result, and in anticipation of potential future campus development proje…
The project will be the complete physical demolition of Buildings 321, 412 and 728M.…
Remove and dispose of temporary buildings 724-48E and 724-49E near the TRU Pads (15-19) in E Area. Move 701-18A from A-Area and install 701-18A in …
This EEC supports activities post Cold and Dark status of Building 235-F. This revision includes mechanical removal and disposition of ancillary eq…
Office trailers 704-19H and 225-5H, are approximately 36 years old. The trailers roof, flooring and weather seals surrounding windows and door open…
Remove existing air station off of private property and install a new air station at the old Williston barricade. Install power at pole: R22 1344G,…
The purpose of this activity would be to remove Office Trailer 025981, located at the Mojave Global Change Facility (MGCF), and dispose of it at th…
Demolition and removal from site T-40 and finish area to grade with seed and straw.…