Replace existing manual pump to an automatic pump on 901 Tank in H-area.…
Cut empty totes in A Area for disposal to Three Rivers Landfill.…
Perform pinch welding activities on stainless steel, titanium alloys and aluminum alloys. The pinch weld process is a solid state welding process t…
Optical apparatus in AMC lab 139 will be used to measure the change in transmittance of polymer-coated, metal films. The aim of the experiment is t…
R and D activities covering the assembly, testing, and maintenance of equipment and systems designed by the SRNL Global Security Department, activi…
Funding will support the project team's small-scale research and development of a Nested Pebble Bed Blanket (NesPeB) to address current blanket concepts' shortcomings and technical immaturity and to pave the way for rapid deployment of fusion power plants.
Install new ice maker at 710-14N. Install insulation around domestic water line. D and R overhead light and replace light switch with receptacle.…
TMO will assist Engineering in performing an internal inspection of the inside of the 296-H stack.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding for the Marine Energy Collegiate Competition (MECC), a prize competitio…
The U.S. Department of Energy (DOE) is proposing to authorize federal funding for the Hydropower Collegiate Competition, a prize competition that c…