Bryan Mound Raw Water Channel Upgrades to Prevent Silt Buildup; Freeport, Texas

This Final Environmental Assessment (EA) was prepared to fulfill the need for analysis of the Bryan Mound Raw Water Intake Structure (RWIS) Upgrades to Prevent Silt Buildup (work package BM-MM-1560) proposed action planned in support of the Strategic Petroleum Reserve Life Extension II (SPR LE-II) project.

For more information, see Raw Water Intake Structure Channel Upgrades Project.