Install outdoor PA speakers per attached work instructions in G-Area.…
Install indoor PA speakers per attached work instructions in 704-16G, 704-24G, and 737-G.…
Relocate 054-18G from its current location on C-Road (entrance to F-Area) to the south side of the 315-M Curation Museum.…
SRNL has been requested to identify a suitable reducing agent to mitigate the strong oxidants from the groundwater in A-M Area.…
The U.S. Department of Energy is proposing to provide funding to the Wisconsin Office of Energy Innovation to design, engineer, and install an inte…
This project would develop a novel mixed amine solvent specifically designed for capturing >97 percent of the CO2 from natural gas combined cycle p…
Plan to complete a front-end engineering design (FEED) study to design and install the Univ of Kentucky CO2 capture system to the LG and E KU Cane …
PB-3 replace sample platform ladder.…
This EEC covers all replacement Process Chiller Refrigerant Monitors that can be performed at Defense Waste Processing Facility (DWPF).…
722-A : Replace damaged floor tiles.…