The proposed action would occur in two stages. The first stage would be installation of National Geodetic Survey-style monuments at four proposed l…
Conduct a seismic source evaluation if traditional vibration trucks or dynamite is required for successful surface reflection survey in the area (r…
The overall goal of the proposed work is to design, construct, and test an ash fouling free air pre-heater to reduce minimum load requirements, inc…
BPA proposes to perform in-kind replacement of wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, g…
The scope of work would include the demolition of Buildings 12-106, 12-106A, and 12-14. These facilities have been deemed excess to the Pantex Pla…
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, A11, B3.1, NREL, Location(s): PR, Office(s): Golden Field Office
Award Number: DE-EE0008766, CX(s) Applied: A9, Geothermal Technologies Office, Location(s): Mult, Office(s): Golden Field Office
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, A11, B3.1, NREL, Location(s): CO, Office(s): Golden Field Office
Proposed activity covers those actions associated with cleaning and maintenance of lasers and associated optics owned by AD at SRNL (A Area).…
Subcontractor will provide roof repairs at Building 717-12F. The Subcontractor will not disturb the existing roof while performing these repairs on…