Repair chill water leak in Air Handling Unit number 4.…
Replace carpet, floor covering, and cove base in Building 707-F.…
SRNL will use an organic carrier to introduce a metallic or ceramic compound to the internal surface of a pinch weld and then conduct pinch weldtri…
Subcontractor will provide roof repairs at Building 716-4A.…
Pending the completion of renovation activities in 773-A, B-147 and 151 Analytical Development Section (ADS) will install and operate an Agilent770…
773-A, B135 and 139 is a multi-purpose laboratory equipped with instrumentation to process and or analyze liquid, solid, and gaseous samplesutilizi…
Award Number: DE-EE0009127, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): CT, Office(s): Golden Field Office
Award Number: DE-EE0009089, CX(s) Applied: A9, A11, Building Technologies Office, Location(s): MT, Office(s): Golden Field Office
Award Number: DE-EE0008910, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): IN, Office(s): Golden Field Office
Award Number: DE-EE0008958, CX(s) Applied: A9, A11, Wind Energy Technologies Office, Location(s): VA, Office(s): Golden Field Office