Replace existing 800 Series modules inside the Remote I/O drops 6, 7, 8 and 9 with equivalent Quantum based modules.…
Plants will be germinated and treated with chemicals-such as organophosphates and flowering promoters.…
Developing an Energy-Conscious Traffic Signal Control System for Optimized Fuel Consumption in Connected Vehicle Environments…
Delivering Clean Air in Denver. Propane Trucks and Infrastructure in Mail Delivery Application…
Advancing Climate and Innovation Goals of Memphis and Shelby County. Electrification of Key Fleet Vehicles to Capture Cost...…
Energy Optimization of Light and Heavy Duty Vehicle Cohorts of Mixed Connectivity, Automation and Propulsion System Capabilities …
DE-FE0024233 Subtask 2.7-Wet ESP and Aerosol Testing at Coal Creek Station. Slipstream field capture studies.…
Increasing Affordability, Energy Efficiency, and Ridership of Transit Bus Systems through Large-Scale Electrification…
Improving Network-Wide Fuel Economy and Enabling Traffic Signal Optimization Using Infrastructure and Vehicle-Based Sensing and Connectivity…
To remove the existing slab and installing a new concrete slab in the K9 Kennel Building. Installing a cinderblock wall in the center of the K9 kennel and install fencing around the K9 kennels.