Bonneville Power Administration (BPA) is proposing to replace its aging VHF radio system at two northwest Montana radio stations: Miller Peak in Mi…
Bonneville Power Administration (BPA) proposes to allow Northern Lights Inc. (NLI) to install underground fiber underneath existing equipment locat…
The Bonneville Power Administration (BPA) proposes to decommission and remove the Hungry Horse radio station and Teakettle Repeater and install two…
Bonneville Power Administration (BPA) proposes to purchase an easement along approximately the easternmost 2.5 miles of Indreland Road from Missoul…
Western Area Power Administration (WAPA) proposes issuing an Outgrant for Nemont Telephone to install buried fiber line serving the Wolf Point Mont…
This project plans to replace an aging 60kV transmission line with a new 115kV line approximately 7.9 miles in length. In addition to this line, op…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…
Conduct initial engineering studies to determine and prioritize which grid components to further invest in.…