The scope of the Bettis Laboratory North Campus Stormwater Project is to support the existing stormwater utility servicing the North Campus area which has met the system's service life.
Los Alamos County (County) proposes to install stormwater infrastructure in Subparcel A-8-a on County property to collect, manage, and send stormwater into Los Alamos Canyon located in Technical Area 02 on DOE/NNSA property south of DP road.
The scope of the Bettis Atomic Power Laboratory North Campus Utility Corridor Project is to support the existing Fire Water and City Water utility services to the North Campus area, which are currently supplied by a looped system that provides redundant service from two directions in the event of a localized system failure.
The U.S. Department of Energy (DOE) EM-LA is proposing to install stormwater controls within the 100-yr floodplains of Effluent, Mortandad, North Ancho, and Potrillo Canyons within Los Alamos National Laboratory (LANL) near Los Alamos, New Mexico.
East River requested a new bay addition at WAPA's Beresford Substation in South Dakota. …
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
Install a rainwater drain system along the 221-H East wall sections 7-18 to drain the rainwater on the roof to the stormwater system. …
The purpose of this project is to install three (3) new reinforced concrete pipes (RCP) with precast reinforced concrete headwalls on Water Gap Roa…
Western Area Power Administration (WAPA) proposes to construct a new Point of Interconnection (POI) at the existing Denison Substation to accommoda…
The U.S. Department of Energy (DOE) plans to complete site preparation for a new pump and treat facility at the Paducah Gaseous Diffusion Plant (PGDP).