Page Type

Search Energy.gov

Page Type
December 31, 2005

Access a Decision and Order issued in 2005.

Office of Hearings and Appeals
December 31, 2005

The Savannah River Site Environmental Report for 2005 is an overview of effluent monitoring and environmental surveillance activities conducted on...

Savannah River Site
December 30, 2005

Inspection of Environment, Safety, and Health Programs at the Los Alamos National Laboratory

Office of Enterprise Assessments
December 30, 2005

Management Controls over the University of California’s Contributions to the Los Alamos National Laboratory Foundation

Office of Inspector General
December 30, 2005

Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 5, 1, 2 SO2 Case. Compliance based on highest, second-highest, short-term, and highest annual concentrations.

Office of Electricity
December 30, 2005

Docket No. EO-05-01: Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Compliance based on highest, second-highest, short-term, and highest annual concentrations.

Office of Electricity
December 30, 2005

Docket No. EO-05-01: Mirant: Ambient 24 Hour SO2 Values: Model vs Monitor, March 2002 to November 2004, showing the model overprediction

Office of Electricity
December 30, 2005

Docket No. EO-05-01: Tables showing modeling of emissions from units of the Mirant Potomac Power Plant.

Office of Electricity
December 30, 2005

Docket No. EO-05-01: Attached is the Operating Plan of Mirant Potomac River, LLC, which is being submitted in compliance with Order No. 202-05-03, issued by the Department of Energy on December 20, 2005, in the captioned proceeding.

Office of Electricity