Page Type

Search Energy.gov

Page Type
December 21, 2005

Status of the Mixed Oxide Fuel Fabrication Facility

Office of Inspector General
December 20, 2005

Federal Managers' Financial Integrity Act

Office of Inspector General
December 20, 2005

Defense Waste Processing Facility Operations at the Savannah River Site

Office of Inspector General
December 20, 2005

Docket No. EO-05-01. Order No. 202-05-3: Secretary of Energy Samuel W. Bodman today issued an order requiring Mirant Corporation’s Potomac River Generating Station in Alexandria, Virginia (Mirant) to immediately resume limited operation. The order wi...

Office of Electricity
December 20, 2005
Office of Electricity
December 20, 2005

Docket No. EO-05-01. This report describes AERMOD modeling results performed for Unit 1 at Mirant's Potomac River Generating Station. The purpose of these runs was to demonstrate that operation of Unit 1 for 24 hours a day loads from 35MW to 88 MW wit...

Office of Electricity
December 19, 2005

Docket No. EO-05-01. Sullivan Environmental Consulting, Inc. has prepared a review of the “Update 1 to: A Dispersion Modeling Analysis of Downwash from Mirant’s Potomac River Power Plant” written by ENSR Corporation on behalf of the Mirant Potoma...

Office of Electricity
December 16, 2005

This is a request by CORNING INCORPORATED for a DOE waiver of domestic and foreign patent rights under agreement DE-FC26-05NT42461.

Office of the General Counsel
December 16, 2005

Issued to Fluor Hanford, Incorporated, related to issues at the Plutonium Finishing Plant and K-Basins facilities at the Hanford Site

Office of Enterprise Assessments
December 16, 2005

Issued to UT-Battelle, LLC, related to Facility Hazard Categorization and Safety Basis Compliance Issues at Oak Ridge National Laboratory

Office of Enterprise Assessments