Search Energy.gov
Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301 (b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No. 202-05-3, issued by the Department of Energy ("DOE" or the "Depar...
Docket No. EO-05-01: This report describes dispersion modeling performed for simultaneous operation of three baseload units at Mirant’s Potomac River Generating Station (PRGS). The units (3,4,5) would operate at maximum load (107 MW) for up to 12 hou...
Docket No. EO-05-01: Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia
Docket No. EO-05-01: Appendix A, Field Sampling Data and Appendix B, Field Reduced Data from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia
Docket No. EO-05-01: Appendix C, Analytical Data from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia
Docket No. EO-05-01: TRC Environmental Corporation (TRC) of Lowell, Massachusetts was retained by Mirant Potomac River, LLC (Mirant) to provide sampling and analytical support in completing a Particulate Emission Test of Unit 1 of the Potomac River gen...
Acquisition of Protective Force Weapons by Sandia National Laboratory, New Mexico
Review of the Independent Auditor's Report on The Institute for Genomic Research for the Year Ending December 31, 2004
Nuclear Material Availability (U)
Docket No. EO-05-01: In sum, although Pepco agrees wilh DOE's directive that Mirant "should immediately take the necessary steps to implement Option A of the intermediate phase proposed in the implementation plan,") that Option does not satisfy the con...