Search Energy.gov
Download the Job Aid 18-1: Install Exhaust Fan Flex Duct (Bath Fan Only)
This job aid aligns with the Seal and Insulate Knee Walls Badge in the Retrofit Installer Badges. It also aligns with Standard Work Specifications 3.0101.1.
This job aid aligns with the Seal and Insulate Knee Walls Badge in the Retrofit Installer Badges. It also aligns with Standard Work Specifications 3.0101.1 and 3.0102.11.
NNSA is partnering with Los Alamos County to provide DOE’s two national laboratories in New Mexico with electricity produced from the County’s new Foxtail Flats solar and energy storage project, which is proposed to be operational by March 1, 2026.
BIL/IRA recipient reporting - Budget justification for three budget periods
BIL/IRA recipient report - budget justification for five budget periods
This job aid aligns with the Insulate Attic Floor and Pass Inspection First Time Badge in the Retrofit Installer Badges. It also aligns with Standard Work Specifications.
This job aid aligns with the Insulate Attic Floor and Pass Inspection First Time Badge in the Retrofit Installer Badges. It also aligns with Standard Work Specifications 4.0103.6.
This job aid aligns with the Insulate Attic Floor and Pass Inspection First Time Badge in the Retrofit Installer Badges. It also aligns with Standard Work Specifications 4.0103.2, 4.0103.4, and 4.0103.6.
This job aid aligns with the Insulate Ducted Distribution System Badge in the Retrofit Installer Badges. It also aligns with Standard Work Specifications 5.0107.1 and 5.0107.2.