Page Type

Search Energy.gov

Page Type
March 11, 2026

The Tribe will install a microgrid that integrates 290 kW of new solar PV capacity together with 140 kW/560 kWh of new battery storage capacity to displace grid-delivered power and maintain resilient energy service.

Office of Indian Energy Policy and Programs
March 11, 2026

Oglala Sioux (Lakota) Housing (OSLH) will install solar photovoltaic (PV) systems to support six tribal facilities on the Pine Ridge Reservation for a total installed capacity of 54.5 kilowatts (kW).

Office of Indian Energy Policy and Programs
March 11, 2026

The Native Village of Tyonek (NVT) will install multiple energy efficiency measures on two buildings: the Tyonek Native Corporation Satellite Office and the Tribal Center.

Office of Indian Energy Policy and Programs
March 11, 2026

The goal of the project is to improve the resilience of the non-grid-connected electrical generation system at GCW to withstand short-term disruptions and rising energy costs.

Office of Indian Energy Policy and Programs
March 11, 2026

Blackfeet Community College will install approximately 53 kilowatts of solar photovoltaic systems on four buildings on the BCC campus.

Office of Indian Energy Policy and Programs
March 11, 2026

The Tribe will install 19 grid-tied, net-metered rooftop solar electric systems on owner-occupied, single-family homes of low-income families on the Bishop Paiute Reservation.

Office of Indian Energy Policy and Programs
March 11, 2026

The Village of Chefornak, along with its community utility, Naterkaq Light Plant, will purchase, install, and integrate a 500-kilowatt (kW)/677-kilowatt-hour (kWh) battery energy storage system into its standalone community wind-diesel grid.

Office of Indian Energy Policy and Programs
March 10, 2026

The Ute Mountain Ute Tribe (UMUT) White Mesa Solar Initiative aims to reduce the Tribe’s dependence on outside energy sources to support UMUT tribal sovereignty and realize cost savings through tribally owned solar energy systems.

Office of Indian Energy Policy and Programs
March 10, 2026

The Seminole Tribe of Florida will install approximately 475 kilowatts (kW) of solar photovoltaic (PV) capacity with approximately 1,810 kilowatt-hours (kWh) of battery storage, transfer switches, and controls.

Office of Indian Energy Policy and Programs
March 10, 2026

This web page is intended to provide resources to applicants selected for award negotiations and award recipients.

Office of Indian Energy Policy and Programs