Page Type

Search Energy.gov

Page Type
April 2, 2024

Innovation fueled the creation of a new tool at EM's Savannah River Site (SRS) that helps ensure equipment being lowered into an underground liquid waste tank does not encounter any interferences.

Office of Environmental Management
April 2, 2024

The Hanford Fire Department is using prescribed burns at the 580-square-mile EM cleanup site to reduce wildfire risks in the late spring and summer.

Office of Environmental Management
April 2, 2024

The Oak Ridge Office of Environmental Management and contractor UCOR recently completed an extensive piping replacement project to extend the life of the Liquid and Gaseous Waste Operations (LGWO) system at Oak Ridge National Laboratory (ORNL).

Office of Environmental Management
April 2, 2024

The Waste Isolation Pilot Plant (WIPP) recently held its first-ever DOE Regional Science Bowl, joining what has become a yearly tradition across the complex for EM sites such as Savannah River, Portsmouth and Paducah.

Office of Environmental Management
April 2, 2024

Table of comments/questions and DOE responses

Office of Environmental Management
April 2, 2024

EM’s Portsmouth Site has finished excavating approximately seven acres for its On-Site Waste Disposal Facility (OSWDF) to prepare for debris from the demolition of X-333, a former uranium enrichment process building measuring more than 50 acres of floor area.

Portsmouth/Paducah Project Office
April 2, 2024

La primera estrategia federal integral describe modos de reducir en un 90% las emisiones en el sector de la construcción para 2050, reforzando la agenda presidencial Invirtiendo en EE. UU. para reducir los costos de energía y abordar la crisis climática.

Energy.gov
April 2, 2024

First Comprehensive Federal Strategy Outlines Pathways to Reduce Emissions 90% in Buildings Sector by 2050, Reinforcing President Biden’s Investing in America agenda to Lower Energy Costs, Improve Resilience, and Tackle the Climate Crisis

Energy.gov
April 2, 2024

Request for Information: Industrial Deployment and Demonstration Opportunities for Carbon Capture Technologies

Hydrocarbons and Geothermal Energy Office
April 2, 2024

Access Authorization Not Granted; Guideline E (Personal Conduct)

Office of Hearings and Appeals