EM Newsletters

RSS
A large white tractor trailer truck drives on a road with cars behind it
EM’s Waste Isolation Pilot Plant (WIPP) has accomplished an EM 2023 priority to complete and dispose of 400 transuranic waste shipments while striving to ensure no backlog of shipments from cleanup at the Los Alamos National Laboratory (LANL) site in New Mexico.
A groundwater diagram
A groundwater treatment well that EM installed two years ago at the Idaho National Laboratory Site is working in parallel with a pump-and-treat system to yield great dividends for the water quality of the underlying Snake River Plain Aquifer.
A large group of people post for a picture
The Oak Ridge Office of Environmental Management and cleanup contractor UCOR recently hosted a new safety culture assistance team that will visit DOE worksites to identify strengths and any gaps to excellence.
Aerial shot of a laboratory
EM project managers at the Idaho National Laboratory (INL) Site have released a draft document to the public proposing a final end state for residual granulated calcine waste, piping, tanks and equipment associated with historic spent nuclear fuel reprocessing.
A man doing maintenance on a wall filled with wires and hoses
A Hanford Site contractor responsible for designing, building and commissioning the Waste Treatment and Immobilization Plant (WTP) has recognized the collaborative efforts of three of its key suppliers with Supply Chain Excellence Awards.