DOE prepared an EIS that evaluated the potential environmental impacts of a proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 500 kilovolt electric transmission system across the U.S.-Canada border. The proposed 220-mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.