Other Documents

You are here

DOCUMENTS AVAILABLE FOR DOWNLOAD

February 22, 2018
EA-2052: Draft Environmental Assessment References
EA-2052: Reference List
July 12, 2017
EA-2030: Cancellation
Middle Entiat River Habitat Restoration Project; Chelan County, Washington
July 26, 2016
EIS-0499: Floodplain and Wetland Assessment

Great Northern Transmission Line Project, Minnesota

February 5, 2016
EIS-0514: Notice of Schedule Extension

Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California

December 16, 2015
EA-2005: Floodplain Statement of Findings

Chromium Plume Control Interim Measure and Plume-Center Characterization, Los Alamos National Laboratory, Los Alamos, NM

June 24, 2014
EIS-0501: FERC Project Update

Golden Pass LNG Export and Pipeline Project, Texas and Louisiana

October 30, 2013
EIS-0283-S2: Amended Interim Action Determination

Disposition of Certain Plutonium Materials at the K-Area Complex, Savannah River Site

April 25, 2013
EIS-0283-S2: Interim Action Determination

Surplus Plutonium Disposition Supplemental Environmental Impact Statement (K-Area Materials Storage (KAMS) Area Expansion at the Savannah River Site)

January 28, 2013
EIS-0225-SA-05: Supplement Analysis Determination

Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components

December 31, 2012
EIS-0470: EPA Notice of Adoption of the Final Environmental Impact Statement

Cape Wind Energy Project in Nantucket Sound, Massachusetts

June 26, 2012
EIS-0283-S2: Interim Action Determination

Surplus Plutonium Disposition Supplemental Environmental Impact Statement (Use of H-Canyon/HB-Line to Prepare Feed for the Mixed Oxide Fuel...

October 17, 2011
EIS-0283-S2: Interim Action Determination

Disposition of Certain Plutonium Materials Stored at the Savannah River Site

April 1, 2011
EIS-0283-S2: Interim Action Determination

Flexible Manufacturing Capability for the Mixed Fuel Fabrication Facility (MFFF)

March 30, 2011
EIS-0283-S2: Amended Interim Action Determination

Disposition of Plutonium Materials from the Department of Energy Standard 3013 Surveillance Program at the Savannah River Site...

January 24, 2011
EA-1732: Floodplain Statement of Findings

Next Autoworks Louisiana, LLC (Formerly V-Vehicle Company) and Advanced Technology Gasoline Vehicle Manufacturing Project in Monroe, Louisiana

August 9, 2010
EA-1835: Environmental Assessment Determination

Midwest Regional Carbon Sequestration Partnership (MRCSP) Phase II Michigan Basin Project in Chester Township, Michigan

July 2, 2010
EA-1859: Floodplain Assessment

Kirkwood Community College Wind Energy Facility

June 29, 2010
Floodplain Statement of Findings

Loan Guarantee to AES Energy Storage, LLC Project Dyno Electric Grid Stability Advanced Battery Systems

April 1, 2010
EA-1795: Floodplain Statement of Findings

Loan Guarantee to Diamond Green Diesel for Construction of the Diamond Green Diesel Facility in Norco, Louisiana

September 25, 2009
EIS-0283-S2: Interim Action Determination

Processing of Plutonium Materials in H-Canyon at the Savannah River Site

December 15, 2008
EA-1533: Floodplain Assessment

Proposed Gas Main and Distribution System Upgrade, Pantex Plant, Amarillo, Texas

December 8, 2008
EIS-0283-S2: Interim Action Determination

Processing of Plutonium Materials from the DOE Standard 3013 Surveillance Program in H-Canyon at the Savannah River Site

October 10, 2008
EIS-0369: Floodplain Statement of Finding

Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada

November 1, 2006
SEA-04: Special Environmental Analysis

Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

March 1, 2004
EIS-0120: Wetland Assessment

F- and H-Area Groundwater Remediation Project at the Savannah River Site, Savannah River Operations Office, Aiken, South Carolina