Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona

The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department.

The document was distributed in two volumes.