The project would remove and dispose of components of these tritium systems, including glove boxes, fume hoods, gas holding tanks, tritium purification system (TPS) process piping (all located in the tritium area in the D-Site basement), parts of the neutral beam boxes (located in the TFTR test cell), contaminated  HVAC ductwork (from both locations), and control room components (located separetly in the D-Site basement).