The subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work to replace “ in-kind “ two “ Bard Type “ 208 VAC, Three Phase, Three Ton wall hung packaged HVAC units with heating units. The units are located in Bldg. 251 which is a Motor Control Center. Both units will be replaced during one mobilization.