The contractor shall furnish all labor, tools, equipment, materials, surveying, services, transportation, storage, and supervision necessary to perform the necessary tasks. The intent is to install three new survey monuments by driving rods into the ground and then provide reinforced concrete protection pads with concrete filled steel pipe bollards around each.