The contractor shall provide all material, packaged unit, tools, consumables, equipment, supplies, transportation, facilities, labor, refrigerant and supervision to replace the 208 voltage, alternating current wall hung packaged heating, ventilation, and air conditioning system servicing Building # 211 that includes heating.