The scope of this umbrella document includes the following: remedial action, including design, construction, and operation of corrective measures; accelerated soil cleanups; integration of cleanup actions conducted in accordance with Resource Conservation and Recovery Act corrective action requirements, with Comprehensive Environmental Response, Compensation, and Liability Act requirements and as applicable, requirements of National Environmental Policy Act; and lining of ditches with geosynthetic materials.