Western Area Power Administration, Desert Southwest Region, proposes to repair damaged insulators and conductors on existing structures along the Glen Canyon-Flagstaff #1 and #2 345 kilovolt Transmission Lines as well as the Flagstaff-Pinnacle Peak #1 and #2 345-kilovolt Transmission Lines during Spring 2018.