Calisolar 16,000 Metric Ton Upgraded Metallurgical-grade Silicon Manufacturing Facility
CX(s) Applied: B1.31
Date: 05/23/2011
Location(s): Ontario, Ohio
Office(s): Loan Guarantee Program Office

The Department of Energy's proposed action is to issue a loan guarantee to Calisolar Incorporated, to retrofit an existing facility at 2525 West Fourth Street in Ontario, Ohio, that would be used to produce 16,000 metric tons of upgraded metallurgical-grade silicon annually.

DOCUMENT(S) AVAILABLE FOR DOWNLOAD