Ross Complex Bridge and Speed Feedback Sign Project CX(s) Applied: B1.13Date: 01/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
January 21, 2016Ross Complex Bridge and Speed Feedback Sign Project
CX(s) Applied: B1.13
Date: 01/21/2016
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to construct short sections of road and a bridge to span over the Portland Vancouver Junction (PVJ) Railroad and install a speed feedback sign system within BPA’s Ross Complex in Vancouver, Washington.