Usk-Boundary No. 1 Transmission Line Impairment Remediation CX(s) Applied: B1.3 Date: 10/15/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
October 15, 2013Usk-Boundary No. 1 Transmission Line Impairment Remediation
CX(s) Applied: B1.3
Date: 10/15/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to address surface impairments on the 230-kV Usk-Boundary No. 1 transmission line. The project involves clearing and grading soil in the existing, cleared right-of-way under two spans of the transmission line between structures 50/4 and 51/1 to remediate line clearance issues.
CX(s) Applied: B1.3
Date: 10/15/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration proposes to address surface impairments on the 230-kV Usk-Boundary No. 1 transmission line. The project involves clearing and grading soil in the existing, cleared right-of-way under two spans of the transmission line between structures 50/4 and 51/1 to remediate line clearance issues.