Shelton-Fairmont Number 2 115-Kilovolt Tap CX(s) Applied: B4.11 Date: 09/12/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
September 12, 2013Shelton-Fairmont Number 2 115-Kilovolt Tap
CX(s) Applied: B4.11
Date: 09/12/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneveille Power Administration proposes to construct a tap on its Shelton-Fairmount #2 115 kilovolt line to interconnect a new Mason Public Utility District #1 (PUD) substation on the Skokomish Indian Reservation. The tap will involve replacing two wood-pole structures on the transmission line, running new conductor in the span between the two wood-poles, and installing metering and equipment in the PUD’s substation.
CX(s) Applied: B4.11
Date: 09/12/2013
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneveille Power Administration proposes to construct a tap on its Shelton-Fairmount #2 115 kilovolt line to interconnect a new Mason Public Utility District #1 (PUD) substation on the Skokomish Indian Reservation. The tap will involve replacing two wood-pole structures on the transmission line, running new conductor in the span between the two wood-poles, and installing metering and equipment in the PUD’s substation.