CX-010220: Categorical Exclusion Determination

South Table Mountain 15 Megawatt Electrical Upgrade CX(s) Applied: B4.13 Date: 02/25/2013 Location(s): Colorado Offices(s): Golden Field Office

Office of NEPA Policy and Compliance

February 25, 2013
Estimated Read Time   min
South Table Mountain 15 Megawatt Electrical Upgrade
CX(s) Applied: B4.13
Date: 02/25/2013
Location(s): Colorado
Offices(s): Golden Field Office

The U.S. Department of Energy (DOE) is proposing to the installation and operation of new electrical infrastructure for the National Renewable Energy Laboratory in Golden, Colorado.