AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
August 9, 2012AT&T Fiber Addition North Bonneville-Ross No. 2
CX(s) Applied: B4.7
Date: 08/09/2012
Location(s): Washington
Offices(s): Bonneville Power Administration
Bonneville Power Administration (BPA) is proposing to allow AT&T to install an additional fiber optic line and vault within BPA’s North Bonneville-Ross right-of-way easement and into an existing wireless communication facility.