Bonneville Power Administration is proposing to replace 15 deteriorating wood pole structures along its La Pine-Chiloquin 230-kilovolt transmission line located in Klamath County, Oregon.
CX(s) Applied: B4.6
Date: 03/21/2012
Location(s): Oregon
Offices(s): Bonneville Power Administration
Bonneville Power Administration is proposing to replace 15 deteriorating wood pole structures along its La Pine-Chiloquin 230-kilovolt transmission line located in Klamath County, Oregon.