CX-007985: Categorical Exclusion Determination

Acquisition of Cowlitz County Public Utility District's 115-Kilovolt Transmission Line CX(s) Applied: B1.24 Date: 02/24/2012 Location(s): Washington Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

February 24, 2012
Estimated Read Time   min
Acquisition of Cowlitz County Public Utility District's 115-Kilovolt Transmission Line
CX(s) Applied: B1.24
Date: 02/24/2012
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration proposes to acquire a 1.5 mile portion of Cowlitz County Public Utility District's existing Longview-Washington Way 115-kilovolt transmission line in order to provide a parallel transmission path for its existing Longview-Cowlitz #1 transmission line and to comply with North American Electric Reliability Corporation/Western Electricity Coordinating Council reliability standards.