Weld Substation Transformer Placement, Greeley, Weld County, Colorado
CX(s) Applied: B4.6
Date: 01/07/2011
Location(s): Greeley, Colorado
Office(s): Western Area Power Administration-Rocky Mountain Region

Western Power Administration will install; one-150 megavolt-ampere transformer 230/115-kilovolt (KV2A), two-230-kilovolt power circuit breaker, four-230-kilovolt switches, one-115-kilovolt power circuit breaker, three-115-kilovolt switches, and associated bus, meter, and control equipment.