Output Power Purchase Agreement with Northwest Energy Supply Cooperative - Barr-Tech, LLC ResourceCX(s) Applied: B4.1Date: 06/30/2010Location(s): Fishtrap, WashingtonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
June 30, 2010Output Power Purchase Agreement with Northwest Energy Supply Cooperative - Barr-Tech, LLC Resource
CX(s) Applied: B4.1
Date: 06/30/2010
Location(s): Fishtrap, Washington
Office(s): Bonneville Power Administration
Bonneville Power Administration (BPA) proposes to make an output power purchase with Northwest Energy Supply Cooperative (NESC) which will take effect on the date BPA and NESC sign the contract. Actual power purchases shall commence at the conclusion of the test energy period (as defined by the contract) and shall continue through the hour ending 2400 on September 30, 2011 (conditionally per the contract). The 1.94 average megawatts (aMW) of continuous renewable energy is referenced here as the output of the Barr-Tech, LLC anaerobic digester methane generation facility, a renewable resource located in Inland Power and Light Company's service territory.