An environmental clearance memorandum was completed for the project on May 5, 2008. The original document is amended to more fully describe the proposed work and electrical equipment required at the Westside Substation. Bonneville Power Administration proposes to install electrical equipment within the existing Westside Substation to support Idaho Falls Power's (IFP) continuing improvements to upgrade their system from 46-kilovolts to 161-kilovolts in response to load growth in their service territory.