Redmond Substation 230-115-Kilovolt Transformer AdditionCX(s) Applied: B4.6Date: 05/07/2010Location(s): Deschutes County, OregonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
May 7, 2010CX(s) Applied: B4.6
Date: 05/07/2010
Location(s): Deschutes County, Oregon
Office(s): Bonneville Power Administration
Bonneville Power Administration proposes to rearrange the 230-115-69-kilovolt (kV) yard to install a new 230-115-kV transformer that would increase system reliability by decreasing thermal overloads, voltage violations, and outages caused by the existing 230-115-kV transformer.