Baseload Energy Inc. Brasada-Harney 115-kilovolt Transmission Line ProjectCX(s) Applied: B4.6Date: 02/04/2010Location(s): Deschutes County, OregonOffice(s): Bonneville Power Administration
Office of NEPA Policy and Compliance
February 4, 2010CX(s) Applied: B4.6
Date: 02/04/2010
Location(s): Deschutes County, Oregon
Office(s): Bonneville Power Administration
The proposed project is a result of an interconnection request that was made by Baseload Energy, Inc., to interconnect onto the Federal Columbia River Transmission System. This interconnection request would accommodate a High Altitude Wind Generation Turbine that would generate up to 8 megawatts of harvested wind power.