CX-000602: Categorical Exclusion Determination

Tillamook-Oceanside, 115-kilovolt Substation InterconnectionCX(s) Applied: B4.6Date: 01/07/2010Location(s): Tillamook County, OregonOffice(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

January 7, 2010
Estimated Read Time   min
Tillamook-Oceanside, 115-kilovolt Substation Interconnection
CX(s) Applied: B4.6
Date: 01/07/2010
Location(s): Tillamook County, Oregon
Office(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) substation terminal at Bay 6 of BPA's Tillamook Substation in order to accommodate Tillamook Public Utility District's (PUD's) request to interconnect its new Oceanside 115-kV transmission line. Relay and metering devices will compose the new terminal at Bay 6 where BPA will connect the last span of Tillamook PUD's new Oceanside 115-kV line.