The first EM shipment of transuranic (TRU) waste from LANL's RANT facility was featured in the October 27, 2020 EM Update. An article in the newsletter describes how collaboration between EM and NNSA  made this shipment possible and the significance of EM utilizing RANT for future shipments of TRU waste to WIPP.

 

Read about the first EM shipment of TRU waste from RANT to WIPP here.