Siemens Corporation – Charlotte, NC

The project will integrate a supercritical carbon dioxide bottoming cycle with a 5.3 MW gas turbine to develop a CHP system that is able to transition rapidly between 50% and 100% load by engaging or bypassing the bottoming cycle while maintaining electrical system efficiency above 30% at all times.