May 2020

Safety Basis Assessment at the Savannah River Tritium Facility

The U.S. Department of Energy (DOE) Office of Nuclear Safety and Environmental Assessments, within the independent Office of Enterprise Assessments (EA), conducted an assessment of the upgraded documented safety analysis (DSA), technical safety requirements document (TSR), and safety evaluation report (SER) for the Savannah River Site (SRS) Tritium Facility. This assessment, conducted from December 2018 through November 2019, is part of ongoing targeted assessments of safety basis documents at SRS.