You are here

Mandatory Photovoltaic System Cost Analysis

Eligibility 
Utility
Savings Category 
Photovoltaics
Program Info
State 
Arizona
Program Type 
Line Extension Analysis
Provider 
Arizona Corporation Commission

The Arizona Corporation Commission requires electric utilities to conduct a cost/benefit analysis to compare the cost of line extension with the cost of installing a stand-alone photovoltaic (PV) system for remote locations with electricity needs. This ruling applies to Arizona Public Service (APS), Tucson Electric Power (TEP), Arizona Electric Power Cooperative and Navopache Electric Cooperative.