You are here

Trona Injection Tests: Mirant Potomac River Station, Unit 1, November 12 to December 23, 2005, Summary Report

Docket No. EO-05-01: Trona injection tests were conducted at Mirant’s Potomac River Station on Unit 1 between November 12 and December 23, 2005. The purpose of these tests was to determine the capability of dry injection of trona to achieve substantial SO2 removal from the stack discharge, and the determination of other operating impacts from he trona injection, if any.